(Summary description)First of all, many customers have to ask a question about how to install the hexagonal wire mesh when buying it. In response to this problem

Introduction to the installation method of hexagonal mesh

(Summary description)First of all, many customers have to ask a question about how to install the hexagonal wire mesh when buying it. In response to this problem

  • Categories:MESH&NETTING
  • Author:
  • Origin:
  • Time of issue:2022-04-27
  • Views:0
Information

First of all, many customers have to ask a question about how to install the hexagonal wire mesh when buying it. In response to this problem, let the hexagonal wire mesh manufacturer introduce the installation method of the hexagonal wire mesh for you today.

Hexagonal wire netting manufacturers


 1. Installation method of hexagonal mesh:
 1. The foundation is soil - pre-embedded: first dig a foundation pit with a size of 50*50*40, then put the column into the foundation pit, pre-buried 40 cm, then pour high-efficiency quick-setting cement, and install the frame after the maintenance is completed. Net, fastened with screws.
 2. The foundation is soil - pre-embedded: first dig the foundation pit, then inject cement into the foundation pit to make a cement pier, and the chassis is drilled and fixed after setting.
 3. The foundation is cement: drill holes on the foundation with a depth of about 40 cm. After completion, insert the column into the high-efficiency quick-setting cement.
  4. Drill holes directly on the foundation, and fix the flange with expansion screws. Flange size 20*20 flange thickness 8-10 thick.
First fix the first column of the hexagonal net, then hook the mesh to the column, and then hook the second column. After the stadium fence is connected, fix the second column. Then hook up the second mesh, and the third post. After tightening the mesh surface, the third column is fixed. And so on, a set of installation can be. In this way, the installation is firm and does not damage the mesh surface.

Keyword:

Scan the QR code to read on your phone

Contact Us

Tel: +86 311 8302 7619
Fax: +86 311 8302 7519
E-mail:  info@highsheen.com

563919028@qq.com
Add: A-1305, ZhuoDa Commerce Building, No.88 Huai An West Road,Shijiazhuang, China

Copyright:  HIGH SHEEN INDUSTRY CO.,LTD.                                                                                                                                             冀ICP备18015706号-1       Powered by www.300.cn

HIGH SHEEN INDUSTRY COMPANY